Installation timelines get quoted loosely online, but the real answer depends on how much is pre-fabricated before the team ever reaches your home.
Key points
- Site measurement and 3D design typically take 3–5 days before production even begins.
- Off-site fabrication of panels, shutters and drawers usually runs 5–10 days depending on order volume.
- On-site installation for a standard L-shaped kitchen is usually completed in 3–5 working days once modules arrive.
- Full-room renovations involving plumbing or electrical changes add extra days beyond the cabinet installation itself.
- Ask for a written installation timeline in your quotation, not just a design timeline, to avoid surprises.
Why this matters when you're planning modular kitchen
At No More Wood, every modular kitchen we design starts from this same material logic — plywood kitchen shutters swell at the sink, laminate peels off at the hinge line, and termites quietly hollow out the carcass behind your cabinets — usually discovered only when a shelf collapses. We build the modular kitchen to avoid that from day one, not patch it later.
Need this done right, not just explained?
Talk to our modular kitchen designers — free site visit, no obligation.